We use cookies — including Google AdSense cookies — to personalise ads and analyse traffic. Opt out at Google Ads Settings. See our Privacy Policy.

📊
A/L Technology Stream · Sri Lanka

Engineering
Technology

Free notes, past papers, diagrams and revision guides aligned with the Sri Lanka A/L Engineering Technology syllabus — covering engineering drawing, mechanisms, electrical systems, manufacturing, measurements, standards and entrepreneurship.

17
Lessons
85+
Files
5
Units
Free
Forever

Advertisement
📢 Google AdSense — 728×90 Leaderboard  |  Slot: 1111111111
← Previous Lesson 16 of 17
Lesson 16
⭐ Latest Upload

ඇස්තමේන්තු කරණය —
Estimating

A/L Engineering Technology Lesson 16 syllabus ආවරණය කරයි — estimate types, bills of quantities (BOQ) preparation, material quantity calculation, labour cost, overhead & profit, rate analysis, tender documents, contract types, project planning (Gantt chart, CPM, PERT) සහ valuation & depreciation ඇතුළු ප්‍රධාන කරුණු ආදිය.

📋 Estimate Types
📄 Bills of Quantities (BOQ)
📐 Material Quantity Calc
👷 Labour Cost
💰 Overhead & Profit
🔢 Rate Analysis
📑 Tender Documents
📃 Contract Types
📅 Gantt Chart
🔗 CPM Network
📊 PERT Analysis
🏛️ Valuation & Depreciation
📥 Lesson 16 — Available Downloads
📄
Full Notes — Estimating
PDF · 6.5 MB · 88 pages
⬇ Download PDF
📄
BOQ Preparation Guide
PDF · 2.4 MB · 24 pages
⬇ Download PDF
📄
Rate Analysis Notes
PDF · 2.2 MB · 22 pages
⬇ Download PDF
Advertisement
📢 Google AdSense — In-Article  |  Slot: 3333333333
Other Lessons
View All →
Unit 1 — හැඳින්වීම හා සැලසුම් චිත්‍ر
Unit 2 — තාක්ෂණවේදය
Unit 3 — නිෂ්පාදන හා ප්‍රමිති
Unit 4 — යාන්ත්‍රික හා ජල ඉංජිනේරු
Unit 5 — ඇස්තමේන්තු හා ව්‍යවසාය
❓ නිතර අසන ප්‍රශ්න — FAQ
A/L Engineering Technology Lesson 16 — ඇස්තමේන්තු කරණය හි ප්‍රධාන මාතෘකා මොනවාද?

Lesson 16 'ඇස්තමේන්තු කරණය' (Estimating) හි ප්‍රධාන මාතෘකා:

  • 📋 Estimate Types — Preliminary, Detailed, Revised estimates
  • 📄 Bills of Quantities (BOQ) — preparation, format, take-off
  • 📐 Material Quantity Calculation — area, volume, linear; waste allowances
  • 👷 Labour Cost — skilled/unskilled; productivity rates; labour constants
  • 💰 Overhead & Profit — site overhead, general overhead (10–15%), contingency (2–5%)
  • 🔢 Rate Analysis — Unit Rate = Material + Labour + Plant + Overhead + Profit
  • 📑 Tender Documents — Notice to tender, specifications, drawings, BOQ, conditions
  • 📃 Contract Types — Lump sum, Unit rate, Cost plus, Design & Build
  • 📅 Project Planning — Gantt chart, CPM Critical Path, PERT analysis
  • 🏛️ Valuation & Depreciation — Straight line, Declining balance
Bills of Quantities (BOQ) — ඇස්තමේන්තු සකස් කිරීමේ ක්‍රමය සහ Rate Analysis?

BOQ Format:

Item No. | Description | Unit | Qty | Rate (Rs.) | Amount (Rs.)

Rate Analysis — Unit Rate build-up:

Material cost + Labour cost + Plant cost + Overhead (10–15%) + Profit (5–10%) = Unit Rate

Tender Sum:

  • Subtotal + Preliminary + Overhead + Profit + VAT + Contingency (2–5%)
Lesson 16 Estimating notes PDF නොමිලේ download කරන්නේ කොහෙන්ද?

AL Tech Hub (altechhub.lk) හි Lesson 16 Downloads කොටසෙන් නොමිලේ:

  • 📄 Full Notes PDF — 6.5 MB, 88 pages
  • 📄 BOQ Preparation Guide — 2.4 MB, 24 pages
  • 📄 Rate Analysis Notes — 2.2 MB, 22 pages
  • 📄 Tender Documents Reference — 2.0 MB, 20 pages
  • 📄 Project Planning CPM & PERT — 2.6 MB, 26 pages
  • 📗 Sample BOQ Template (XLSX) — 0.9 MB, editable
  • 📊 Slide Deck (PPTX) — 8.8 MB, 56 slides
  • 📝 Practice Q&A (DOCX), Past Papers, 🗜️ Complete Bundle (ZIP 29 MB)
Gantt Chart, CPM (Critical Path Method) සහ PERT අතර වෙනස කුමක්ද?

Gantt Chart — Bar chart: activities vs time:

  • Visual, simple; no dependency logic for complex projects

CPM (Critical Path Method) — Network diagram:

  • Fixed durations; Critical Path = longest path = min project duration
  • Float/slack calculated; construction & manufacturing projects

PERT — Probabilistic durations:

te = (to + 4tm + tp) / 6  |  to=optimistic, tm=most likely, tp=pessimistic